 | News&Events |
|
| |
 | |
|
|
11 February, 2008 |
Project: Production and delivery of Fire fighting diesel pump units Client: Hellenic Petroleum-OKTA Refinery Brief description: Production and delivery of fire fighting diesel unit type DPA25SP50/470 Realized activities:- Characteristics (pump): Q=280 l/sec H=120m Characteristics (diesel Engine) Type – PERKINS • P=490 KW / 1800 rpm • Seria 2506A-E15TAG1 • Induction system: Turbocharged and air to air charge cooled, 6 cylinder diesel engine • Cylinder arrangement – Vertical in line • Combustion system – Direct injection • Cooling system – Water cooled • Displacement – 15.2 litres • Compression ratio: 16:1 • Dimensions (mm) – Length: 2657 mm Width: 1120 mm Height: 1718 mm • Dry weight: - 1633 kg    |
23 January, 2008 |
Project: Production and delivery of propeller pumps and diesel pump units
Client: Government of Republic of Macedonia-Direction of Protection and Saving
Financier: Ministry of Economy of Republic of Macedonia-Sector of agro-industry and structural reforms Brief description: Production and delivery of Mobile pump units, ready for traffic participation, with installed signal and breaking devices, suitable for pulling and protected of atmospheric influences. The main application is for firefighting purposes, irrigation and drainage. The pump units are equipped with monitoring panel, ejector system, suction hoses - length 6 m, two discharge connectors and fire fighting hoses with total length of 300 m per diesel pump unit, including fire fighting couplings for fast connecting.
Realized activities: -Production and delivery of 2 propeller pumps with capacity of 800 l/sec, TDH of 5.5m, 75 KW electro motor on 960rpm; -Production and delivery of diesel pump units (diesel engine IVEKO 86KW,pump S10CP31 with characteristics Q=42-47 l/sec, H=60-74 mvs on 2300 rpm, transported medium-water, sealing-lip seal).
 
 |
14 January, 2008 |
MZT Pumpi has signed a contract with Mittal Steel Zenica for its Capital Refurbishment in the total value of 3 million EUR. The project has officially started in June 2007 and is expected to be finished up to April, 2008. The basic objective of the project was Reparation of pumps for diferent kind of mediums, water treatment Equipment (sedimidention thanks, filters and e.t.c),Reparation of lubrication systems with maximal pressure up to 250 bar. Steel construction fabricated with welding of elements of hot-rolled steel sheet.
Activities to be realized:
• Reparation and installation of 82 pumps • Production and installation of water treatment equipment • Reparation and installation of 10 lubrication systems • Installation of cooling tower • Design and manufacturing of steel constructions
Photos: archives of MZT Pumpi 2008.
 
 
|
25 December, 2007 |
MZT Pumpi has successfully finished the project FERONIKEL Plants Glogovac,Kosovo for “Rehabilitation of mazut pumping stations and storage tanks in Newco Feronikeli Complex,ferrinickel production plant.The main objective of the project was renovation and putting into operation the pump station and storage tanks. The pumps for masut, valves, instruments, pipes are renovated and put into operation. The thermo isolation is made and the tanks are completely renovated.The following activities were performed:• Rehabilitation of the pump station for masut (new pumps, valves, instrumentation, pipes, thermal insulation)• Design, manufacturing and commissioning of two steel tanks (volume 2 x 400 m3) for mazut and execution of new pipe connection to the pump station:• Rehabilitation of the pump station for decantation of masut (rehabilitation of pumps, valves, instrumentation, pipes, thermal insulation)• Rehabilitation of the pump station for masut, near by the tank with V=5000 m3:• (rehabilitation of pumps, valves, instrumentation, pipes, thermal insulation)• Reparation of the pump station for masut for daily needs and two steel tanks (volume 2 x 40 m3)• Commissioning.Photos: Archives of MZT Pumpi 2007. 
  |
15 December, 2007 |
Realization of the project “Reconstruction of pump station-BIVOLAK”-KosovoObjective:Rehabilitation of pump station for transport of technical water from Bivolak to the Feronikeli plant in Drenas.The project comprised the following Activities:• Supply and installation of valves and pipe equipment for vertical pumps• Repair of pumps• Supply and installation of a new vertical pump• Rehabilitation of the scraper in the sedimentation tank• Rehabilitation of dozing equipment for flocculation equipment• Inspection of the 17 km pipeline to the Drenas plant• Electrical works (supply and installation of new control boards for two pumps, inspection, automation, rehabilitation of electric motors, transformers etc)• Civil works.• CommisioningPhotos: Archives of MZT Pumpi 2007.  |
24 October, 2007 |
MZT Pumpi was present on the exhibition PCV held in Moscow from 15-18 of October, 2007.
This is specialized exhibition for pumps, compressors, pneumatics, pneumatics tools, valves, actuators and engines brought together over 500 exhibitors, covered an area of 22.000 sq.m, and brought an outstanding business opportunities during its duration from 15-18 October,2007. MZT Pumpi was situated in Hall 4.1, and it represented its extensive product range.
Visit PCVEXPO website. 
|
20 October, 2007 |
|
|
|
 |
| |
|
| |
|
|
|
|  |
|