Project:

Design, Manufacturing, Installation and putting into operation of the reconstructed system for lifting and transporting dust with increased capacity of 40%

Realization of the project:

2011 year

Brief discription:

Design, Manufacturing, Installation and putting into operation of the reconstructed system for lifting and transporting dust with increased capacity of 40%, by:

  • Increasing the capacity of the elevators on the line 1 and line 2
  • Lead dust from the elevators

Realized activities:

  • Complete replacement of drive unit
  • Complete replacement of take up unit
  • Manufacturing and replacement of buckets for elevators with increased volume
  • Replacement of chains for elevators
  • Reconstruction of unloading of dust
  • Design and manufacture of dust transporters for increased capacity, with a central transport chain
  • Assembly of the overall equipment

BOBOV DOL - Bulgaria

fair thumbnail

Production, supervision during installation and startup of pumps for transport of lime milk for the process of gas cleaning in the thermal power plant Bobov Dol-Bulgaria.

Contact Information

Str. Pero Nakov bb,
1000 Skopje,
Republic of Macedonia

Tel:
+389 (0)2 254 98 17
+389 (0)2 254 98 18

Fax/tel:
+389 (0)2 254 98 33
+389 (0)2 254 98 34

Web: www.pumpi.com.mk
E-mail: info@pumpi.com.mk


MZT PUMPI © 2012