BOBOV DOL - Bulgaria

Project:

Production, supervision during installation and startup of pumps for transport of lime milk for the process of gas cleaning in the thermal power plant Bobov Dol-Bulgaria.

Realization of the project:

2011 year

Brief discription:

The pumps are intended for transport of lime milk for the process of gas cleaning in the thermal power plant Bobov Dol-Bulgaria. On November 2011 a new pump station was built for process of gas cleaning where were installed 6 pump aggregates; type D 80-60-74/U, each with Installed Motor

Realized activities:

  • Design and production of 6 pump units (Horizontal Double Inlet Split Case Pumps) with Capacity up to: Q=6000 [m3/h], H=25 [m], Pm=630 [kW], n=730 [rpm], U=6000 [V]
  • Supervision during installation and commissioning

BOBOV DOL - Bulgaria

fair thumbnail

Production, supervision during installation and startup of pumps for transport of lime milk for the process of gas cleaning in the thermal power plant Bobov Dol-Bulgaria.

Contact Information

Str. Pero Nakov bb,
1000 Skopje,
Republic of Macedonia

Tel:
+389 (0)2 254 98 17
+389 (0)2 254 98 18

Fax/tel:
+389 (0)2 254 98 33
+389 (0)2 254 98 34

Web: www.pumpi.com.mk
E-mail: info@pumpi.com.mk


MZT PUMPI © 2012