Refernce 1

Reference 2

Belgrade heating plants, Belgrade - Serbia

Project:

Production and delivery of 16 pump units

Realization of the project:

2007 year

Brief discription:

The main objective of the project was extending the existing heating system in Belgrade, Serbia. Four pump stations were equipped with new pump equipment. The temperature of transported water was between 90-200°C.

Realized activities:

  • Design , production and supervision during installation and start up of 5 pump units Q=1600 [m3/h]; H=12 [bar], Pm=710 [kW]
  • Design , production and supervision during installation and start up of 1 pump unit Q=1800 [m3/h]; H= 5.2[bar], Pm=355 [kW]
  • Design , production and supervision during installation and start up of 7 pump units Q=1100 [m3/h]; H=5 [bar], Pm=250 [kW]
  • Design , production and supervision during installation and start up of 1 pump units Q=200 [m3/h]; H=11 [bar], Pm=200 [kW]
  • Design , production and supervision during installation and start up of 2 pump units Q=30 [m3/h]; H=11 [bar], Pm=37 [kW]

BOBOV DOL - Bulgaria

fair thumbnail

Production, supervision during installation and startup of pumps for transport of lime milk for the process of gas cleaning in the thermal power plant Bobov Dol-Bulgaria.

Contact Information

Str. Pero Nakov bb,
1000 Skopje,
Republic of Macedonia

Tel:
+389 (0)2 254 98 17
+389 (0)2 254 98 18

Fax/tel:
+389 (0)2 254 98 33
+389 (0)2 254 98 34

Web: www.pumpi.com.mk
E-mail: info@pumpi.com.mk


MZT PUMPI © 2012