Project:
Production and delivery of 16 pump units
Realization of the project:
2007 year
Brief discription:
The main objective of the project was extending the existing heating system in Belgrade, Serbia. Four pump stations were equipped with new pump equipment. The temperature of transported water was between 90-200°C.
Realized activities:
- Design , production and supervision during installation and start up of 5 pump units Q=1600 [m3/h]; H=12 [bar], Pm=710 [kW]
- Design , production and supervision during installation and start up of 1 pump unit Q=1800 [m3/h]; H= 5.2[bar], Pm=355 [kW]
- Design , production and supervision during installation and start up of 7 pump units Q=1100 [m3/h]; H=5 [bar], Pm=250 [kW]
- Design , production and supervision during installation and start up of 1 pump units Q=200 [m3/h]; H=11 [bar], Pm=200 [kW]
- Design , production and supervision during installation and start up of 2 pump units Q=30 [m3/h]; H=11 [bar], Pm=37 [kW]
Buchim mine – Radovish, Macedonia
Manufacturing, delivery and install of 3 booster sets for a pumping station in Buchim mine – Radovish, Macedonia
Contact Information
Str. Pero Nakov bb,
1000 Skopje,
Republic of Macedonia
Tel:
+389 (0)2 254 98 17
+389 (0)2 254 98 18
Fax/tel:
+389 (0)2 254 98 33
+389 (0)2 254 98 34
Web: www.pumpi.com.mk
E-mail: info@pumpi.com.mk