


MINEL, Serbia
Project:
Manufacturing of end suction centrifugal pumps for transport of cold and hot water in Belgrade Heating Plants, Serbia
Realization of the project:
2009 year
Brief discription:
The main aim of this project was manufacturing of end suction pumps for circulation of hot and cold water through heating plant. Pumps are installed in Belgrade Heating Plants and they are intended for transport of cold and hot water up to 180°C.
Realized activities:
- Manufacturing of 3 End suction – single stage pumps
- Characteristics:
Type ST10CP16c with electromotor, N=11kW, n=2900 rpm, Q=70-80m³/h, H=2bar
Type ST30CP51 with electromotor, N=250kW, n=1450 rpm, Q=1190 m³/h, H=5bar
Type ST35CP51 with electromotor, N=710 kW, n=1450 rpm, Q=1700 m³/h, H=12,3 bar
Buchim mine – Radovish, Macedonia
Manufacturing, delivery and install of 3 booster sets for a pumping station in Buchim mine – Radovish, Macedonia
Contact Information
Str. Pero Nakov bb,
1000 Skopje,
Republic of Macedonia
Tel:
+389 (0)2 254 98 17
+389 (0)2 254 98 18
Fax/tel:
+389 (0)2 254 98 33
+389 (0)2 254 98 34
Web: www.pumpi.com.mk
E-mail: info@pumpi.com.mk
