Refernce 1

Rafaelo 2002 – Tirana, Albania

Project:

Design, fabrication, assembling, installation and supervision of crushing and separation equipment

Realization of the project:

2007 year

Brief discription:

The main aim of this project was to design and produce all the steel construction components for the sand / gravel separation plant.

METALEX designed and produced 10 (ten) belt conveyors of different lengths and widths with side walkways.

Realized activities:

- Manufacturing and delivering of the following equipment:

  • 10 conveyor belts
  • 4 platforms
  • 3 steel bunkers
  • Steel Construction
  • Supervision during installation and commissioning

BOBOV DOL - Bulgaria

fair thumbnail

Production, supervision during installation and startup of pumps for transport of lime milk for the process of gas cleaning in the thermal power plant Bobov Dol-Bulgaria.

Contact Information

Str. Pero Nakov bb,
1000 Skopje,
Republic of Macedonia

Tel:
+389 (0)2 254 98 17
+389 (0)2 254 98 18

Fax/tel:
+389 (0)2 254 98 33
+389 (0)2 254 98 34

Web: www.pumpi.com.mk
E-mail: info@pumpi.com.mk


MZT PUMPI © 2012