US STEEL - Serbia

Project:

Production, supervision during installation and start up of pumps for furnace cooling in US Steel - Serbia

Realization of the project:

2007 year

Brief discription:

The purpose of the project was increasing the furnace capacity. In the project were predicted new pumps with double flow capacity existing. A new pump station for back water was constructed and equipped with new pumps.

Realized activities:

  • Design and production of 2 pump units Q=4000 [m3/h], H=80 [m], Pm=1300 [kW], n=1000 [rpm], U=6000 [V]
  • Design and production of 2 pump units Q=4000 [m3/h], H=10 [m], Pm=160 [kW], n=500 [rpm], U=400 [V]
  • Supervision during installation and commissioning

Buchim mine – Radovish, Macedonia

fair thumbnail

Manufacturing, delivery and install of 3 booster sets for a pumping station in Buchim mine – Radovish, Macedonia

Contact Information

Str. Pero Nakov bb,
1000 Skopje,
Republic of Macedonia

Tel:
+389 (0)2 254 98 17
+389 (0)2 254 98 18

Fax/tel:
+389 (0)2 254 98 33
+389 (0)2 254 98 34

Web: www.pumpi.com.mk
E-mail: info@pumpi.com.mk


MZT PUMPI © 2010