US STEEL - Serbia
Project:
Production, supervision during installation and start up of pumps for furnace cooling in US Steel - Serbia
Realization of the project:
2007 year
Brief discription:
The purpose of the project was increasing the furnace capacity. In the project were predicted new pumps with double flow capacity existing. A new pump station for back water was constructed and equipped with new pumps.
Realized activities:
- Design and production of 2 pump units Q=4000 [m3/h], H=80 [m], Pm=1300 [kW], n=1000 [rpm], U=6000 [V]
- Design and production of 2 pump units Q=4000 [m3/h], H=10 [m], Pm=160 [kW], n=500 [rpm], U=400 [V]
- Supervision during installation and commissioning
Buchim mine – Radovish, Macedonia
Manufacturing, delivery and install of 3 booster sets for a pumping station in Buchim mine – Radovish, Macedonia
Contact Information
Str. Pero Nakov bb,
1000 Skopje,
Republic of Macedonia
Tel:
+389 (0)2 254 98 17
+389 (0)2 254 98 18
Fax/tel:
+389 (0)2 254 98 33
+389 (0)2 254 98 34
Web: www.pumpi.com.mk
E-mail: info@pumpi.com.mk